Learn how to order a Roofr multi-building report.
Roofr multi-building reports deliver comprehensive roof reports of multiple full-size structures, including length measurements, area calculations, pitch information (where available), detailed diagrams, and a consolidated summary of all structures.
💡Secondary Structures vs. Multi-Building Reports
Secondary Structures:
- Smaller accessory buildings (garages, sheds, etc.) associated with a main property
-
Typically included as part of a standard property report
Multi-building Reports:
- Complete, standalone structures requiring separate measurement
- Sections of very large structures (such as portions of malls or airports)
- Consolidated into a single comprehensive order for convenience and cohesive reporting
How to order a Roofr multi-building report
Start your order
- From the Jobs section of your Roofr dashboard, click New
- Select Report from the dropdown menu
Enter the address
- Enter your required address in the pop up window
- Addresses will auto-populate from the Google database
- Ensure the address is correct and click, Continue
Place pins on all required structures
💡A pin will need to be placed on the overhead image on each building or building section required
-
To add a second pin: Click Add Multi-Family building
- This confirms your first pinned structure as building '1' and creates a second pin
- Move the second pin to your next building or section
-
Click Add Multi-Family building again to add another pin
- Continue adding pins by clicking the Add Multi-family building button
💡Each click locks in your previous pin and creates a new movable pin. Only locked-in, numbered pins will be included in your order.
- Click Confirm when you have placed numbered pins on all required buildings or sections
Submit secondary structure and notes requests
- Select if you need to include secondary structures on the property
- The notes section is also the place to include other information that may be required about the property or structure
- When all the information is entered, click Next
- Add extras to the order as needed
💡The number of reports shown at checkout should match the number of buildings you need
- Click Order report to confirm
💡Your entire order will be stored under one job address, and each building measurement will be numbered in the order you placed the pins
💡Multi-building reports do not qualify for faster than 24 hour turn-around times
🏘️ How to add an additional building to your multi-building report
Missed a structure and need to add it to your multi-building report? No problem!
From the job card;
- Click +Roofr Report
- Confirm the location of the additional building
- Include the note ‘Just the unit/building pinned’
- Order report
💡 This report will be added as the next number in the multi-building report on the job
What's Next?